Overview
The Town of Drayton Valley required a new raw water pump station (RWPS) to supply their new water treatment plant (WTP). Magna IV Engineering formed part of the Integrated Project Delivery (IPD) team, in a progressive method that integrates all stakeholders (owner, consultant, general contractor, and major sub consultants) throughout all phases of the project. This was the first CCDC 30 IPD contract in Canada.
Through the validation period, a cost-effective solution was selected, separating the electrical building and river mounted pumps instead of a more conventional pump station design. This innovative design mitigated significant construction risk and cost, and provided 1 in 100-year flood resiliency.
Scope
Power distribution design
Outdoor backup diesel generator design
LED lighting design
Electrical site servicing
Control systems, instrumentation, and communication network design
An underground single-mode fiber optic cable was installed between the RWPS and the WTP to provide dedicated, reliable, fast and secure communication
Programming and systems integration