Control System Migration Commissioning Support

Tehachapi, CA 93561, USA

2021

Automation, Engineering

Industrial

Control System Migration Commissioning Support

Tehachapi Cement Plant Kiln

Overview

Lehigh Hanson’s Tehachapi Cement Plant   in the mountains of southern California is one of the state’s largest cement manufacturing   facilities.

Magna IV Engineering was engaged   to support commissioning activities following a migration of all existing   instrumentation and control equipment to new Siemens PLCs. This included setup   and calibration of instrumentation and control equipment.

Scope
  • Commissioning support to test equipment, troubleshoot wiring within MCC compartments, I/O Cabinets, and field devices

  • All local tests to confirm equipment functionality, configure HART devices and make necessary adjustments to field equipment (Equipment Check-out)

  • Construction progress verification and redline development for as-builts for 2 E-houses

  • Signal status verification for remote equipment operation in the field with radio communication to the control room

  • Lock-out activities and vendor assistance with Pfister Panels and Natural Gas Burner, Calciner and Stabilizing units